{"id":736,"date":"2023-06-16T15:53:50","date_gmt":"2023-06-16T14:53:50","guid":{"rendered":"https:\/\/orservices.co.uk\/?post_type=casestudies&p=736"},"modified":"2024-04-29T12:54:20","modified_gmt":"2024-04-29T11:54:20","slug":"dumers-lane-bury","status":"publish","type":"casestudies","link":"https:\/\/orservices.co.uk\/casestudies\/dumers-lane-bury\/","title":{"rendered":"Dumers Lane, Bury"},"content":{"rendered":"\n

This project involved a comprehensive refurbishment of the building’s exterior and interior. ORS carried out various tasks to enhance the overall look and condition of the property.<\/p>\n\n\n\n

The exterior of the building underwent a thorough cleaning process with a 3000psi fungicidal pressure wash. This process effectively removed dirt and grime from the vertical wall cladding. Additionally, the profile cladding, capping\u2019s, and flashings, previously in a blue colour, were carefully prepared and re-sprayed to restore their appearance. The external faces of all aluminium windows, doors, and curtain walling were also prepared and re-sprayed, giving them a refreshed and uniform look.<\/p>\n\n\n\n

Inside the building, ORS addressed corrosion issues by conducting cleaning and abrasion, and applying a certified 60-minute intumescent paint system to the structural steelwork. This ensures compliance with fire safety standards and enhances the longevity of the steelwork.<\/p>\n\n\n\n

Throughout the project, ORS maintained meticulous workmanship and attention to detail. A 10-year applicators warranty is included, providing clients with peace of mind regarding the durability and longevity of the completed work.<\/p>\n\n\n\n

The comprehensive refurbishment carried out by ORS at Dumers Lane in Bury has transformed both the exterior and interior of the building. The cleaning, preparation, and re-spray processes have revitalized the vertical wall cladding, profile cladding, capping\u2019s, and flashings, resulting in an improved aesthetic appearance. The re-spraying of the aluminium windows, doors, and curtain walling has given them a fresh and cohesive look. Internally, the corrosion issues have been effectively addressed, ensuring the structural steelwork is protected and meets fire safety requirements. With the inclusion of a 10-year applicators warranty, clients can trust in the quality and durability of the work carried out by ORS.<\/p>\n","protected":false},"excerpt":{"rendered":"