{"id":871,"date":"2023-06-19T12:18:56","date_gmt":"2023-06-19T11:18:56","guid":{"rendered":"https:\/\/orservices.co.uk\/?post_type=casestudies&p=871"},"modified":"2023-06-30T10:42:31","modified_gmt":"2023-06-30T09:42:31","slug":"red-bull-racing-milton-keynes","status":"publish","type":"casestudies","link":"https:\/\/orservices.co.uk\/casestudies\/red-bull-racing-milton-keynes\/","title":{"rendered":"Red Bull, Milton Keynes"},"content":{"rendered":"\n

ORS undertook a re-spray project at Red Bull Racing HQ, focusing on the existing concrete and plasterboard ceilings, along with associated mechanical and electrical (M&E) structures. The aim was to refresh and enhance the appearance of these surfaces.<\/p>\n\n\n\n

To minimize disruption to the operations of the business, all works were carefully scheduled and completed out of hours. This approach ensured that the day-to-day activities and productivity of the facility remained unaffected while the re-spray project was underway.<\/p>\n\n\n\n

The existing concrete and plasterboard ceilings, as well as the M&E structures, were meticulously prepared and coated with a high-quality spray application. This process resulted in a rejuvenated and visually appealing finish throughout the premises.<\/p>\n\n\n\n

ORS demonstrated their commitment to delivering quality workmanship with minimal impact on the client’s operations. The refreshed ceilings and M&E structures contributed to an improved and visually appealing working environment for Red Bull Racing, reflecting the high standards and attention to detail associated with the renowned brand.<\/p>\n","protected":false},"excerpt":{"rendered":"