{"id":875,"date":"2023-06-19T11:53:20","date_gmt":"2023-06-19T10:53:20","guid":{"rendered":"https:\/\/orservices.co.uk\/?post_type=casestudies&p=875"},"modified":"2023-06-30T10:50:02","modified_gmt":"2023-06-30T09:50:02","slug":"profab-access-atherstone","status":"publish","type":"casestudies","link":"https:\/\/orservices.co.uk\/casestudies\/profab-access-atherstone\/","title":{"rendered":"Profab Access, Atherstone"},"content":{"rendered":"\n

ORS carried out a project at Profab Access in Atherstone, focusing on the preparation and re-spray of the existing steelwork.<\/p>\n\n\n\n

The steelwork was prepared to ensure optimal adhesion and a flawless finish. Any existing coatings were carefully removed, and the surfaces were cleaned and treated as necessary. The goal was to restore the steelwork’s appearance and provide a consistent colour throughout.<\/p>\n\n\n\n

ORS also provided powered access equipment to facilitate safe and efficient access during the project. This allowed their team to work at height with ease, ensuring that every area of the steelwork was properly prepared and re-sprayed.<\/p>\n\n\n\n

The project resulted in a refreshed and uniform appearance, enhancing the overall aesthetic of the facility.<\/p>\n","protected":false},"excerpt":{"rendered":"