{"id":876,"date":"2023-06-19T11:50:42","date_gmt":"2023-06-19T10:50:42","guid":{"rendered":"https:\/\/orservices.co.uk\/?post_type=casestudies&p=876"},"modified":"2023-06-30T10:57:37","modified_gmt":"2023-06-30T09:57:37","slug":"barnardos-garstang","status":"publish","type":"casestudies","link":"https:\/\/orservices.co.uk\/casestudies\/barnardos-garstang\/","title":{"rendered":"Barnardos, Garstang"},"content":{"rendered":"\n

The steelwork and ceiling were carefully prepared to ensure optimal adhesion of the new coating. Any existing coatings were removed, and the surfaces were cleaned, repaired, and treated as necessary. This preparation process ensured a smooth and durable finish.<\/p>\n\n\n\n

Similarly, the blockwork was thoroughly prepared to remove any contaminants and provide a suitable surface for the new coating. Cracks and imperfections were repaired, and the blockwork was made ready for re-spraying.<\/p>\n\n\n\n

To facilitate safe and efficient access to all areas of the project, ORS provided powered access equipment. This allowed their team to work at height and reach even the most challenging areas, ensuring that the steelwork, ceiling, and blockwork were properly prepared and re-sprayed.<\/p>\n","protected":false},"excerpt":{"rendered":"