{"id":877,"date":"2023-06-19T11:46:40","date_gmt":"2023-06-19T10:46:40","guid":{"rendered":"https:\/\/orservices.co.uk\/?post_type=casestudies&p=877"},"modified":"2023-08-04T15:26:39","modified_gmt":"2023-08-04T14:26:39","slug":"versus-studios-leeds","status":"publish","type":"casestudies","link":"https:\/\/orservices.co.uk\/casestudies\/versus-studios-leeds\/","title":{"rendered":"Versa Studios, Leeds"},"content":{"rendered":"\n

ORS carried out a comprehensive refurbishment project involving the preparation and re-spray of various components at Versa Studios<\/a>, including roof liner panels, portal frame, and galvanised purlins.<\/p>\n\n\n\n

To ensure a flawless and long-lasting finish, the existing surfaces were carefully prepared. Any previous coatings, corrosion, or imperfections were addressed through thorough cleaning, repairs, and appropriate treatment.<\/p>\n\n\n\n

ORS also provided powered access equipment to facilitate safe and efficient work at height. This enabled their team to access all areas requiring preparation and re-spraying, ensuring no compromise in quality or coverage.<\/p>\n\n\n\n

By utilising previous expertise in surface preparation techniques as well as high-quality coatings, ORS successfully completed the preparation and re-spray of the roof liner panels, portal frame, and galvanised purlins at Versus Studios. The result was a refreshed and visually appealing environment, meeting the desired standards and enhancing the overall aesthetic of the facility.<\/p>\n","protected":false},"excerpt":{"rendered":"